Architectural Control Committee Chair: Derek Davidson, At-Large Director

Approved Projects:

AddressDescriptionDate SubmittedDate of ACCDate ApprovedExhibitStatus
1285 S Gentle Valley DriveBack porch upgrades10/25/202210/27/202210/27/22VIEWApproved/Not installed
1285 S GENTLE VALLEYBackyard Playset01/01/2101/05/2101/05/21VIEWComplete
1166 S Gentle ValleyBackyard Playset01/03/2101/05/2101/05/21VIEWComplete
1166 S Gentle ValleySunroom Upgrade08/07/2008/10/2008/10/20VIEWComplete

ACC Submission Tool:

Owners may either use the submission tool below or may provide up to two (2) paper plan sets to the President.

Pursuant to Section 9. Use and Division of Lots (c) Submission of Plans. In order to maintain a beautiful and pleasing setting in the Subdivision no more than two (2) sets of building and site improvement plans and specifications must be submitted to the Architectural Control Committee (“Committee”) for its approval prior to the commencement of construction. The Committee shall act to enforce the requirements of these Covenants in a reasonable manner. The Committee has the authority to maintain the architectural conformity of the Subdivision, and in consideration thereof shall determine that the proposed construction shall not detract from the development and shall enhance the purpose of the development to provide a beautiful and pleasing setting in the Subdivision. The Committee shall consider such matters as the proposed square footage, location, materials, exterior style and landscaping, etc. The Committee may adopt rules or bylaws explaining the mechanics of its operation and providing for a twenty-one (21) day maximum time within which plans must be reviewed and approved or disapproved after submission, and if not approved or disapproved in that period, that the same shall be considered as automatically approved. The Board may also exercise the duties of the Committee in the event the Board deems it necessary and efficient to do so.